Installation of 11 kV Power Cables Between 481 and 482 SS

GECO
Dubai, UAE
2022
Completed
Installation of 11 kV Power Cables Between 481 and 482 SS
6 photos

Project Gallery

Installation of 11 kV Power Cables Between 481 and 482 SS - Gallery 2
Installation of 11 kV Power Cables Between 481 and 482 SS - Gallery 3
Installation of 11 kV Power Cables Between 481 and 482 SS - Gallery 4
Installation of 11 kV Power Cables Between 481 and 482 SS - Gallery 5
Installation of 11 kV Power Cables Between 481 and 482 SS - Gallery 6

Project Overview

Comprehensive 11 kV power cable installation project involving cable removal, laying, and complete substation interconnection between 481 and 482 substations.

Key Features

Removal of 18 existing cables from the duct-bank area
Supply and arrangement of cable rollers and guide equipment
Cable drum placement and management systems
Power cable laying in trenches and substation areas
Cable tie installation and labor support services

Project Details

GECO

Dubai, UAE

2022

Completed

11 kV Power Cable Installation & Substation Connection