7+ years of proven engineering, construction, and equipment excellence across UAE and Saudi Arabia.
Get your project quote today
Major 132 kV high-voltage cable installation project for substation connections across the UMMDAMAN-VALLEY-SENAAT system.
Completed
132 kV Cable Installation & Substation Systems
Precision 132 kV cable installation for the Pondview substation, ensuring a reliable high-voltage power distribution infrastructure.
132 kV Substation Cable Installation
Concrete crash barrier installation at Hassyan Power Plant, ensuring safety and infrastructure protection through precision engineering.
Concrete Safety Barrier Installation
Comprehensive 11 kV power cable installation project involving cable removal, laying, and complete substation interconnection between 481 and 482 substations.
11 kV Power Cable Installation & Substation Connection
Comprehensive maintenance and repair works for water transmission and distribution networks across Dubai, including pipeline repairs, specialized coupling installations, and reinstatement works.
Ongoing
Water Network Maintenance & Pipeline Repair
Supply, installation, testing and commissioning of 132 kV cable works for JABLPUMP 132/11 kV substation, including power and fiber optic cables with civil construction and electrical works for JABLPUMP-SHIPMENT and JABLPUMP-JAFZ circuits.
132 kV Power & Fiber Optic Cable Installation
Civil sub-contractor for HUMANCTY-KTJR/HRSR 132 kV Cable Circuit project, providing comprehensive civil works, cable laying, and outage-related activities in compliance with DEWA standards. Successfully commissioned on 9 November 2017.
Completed - Commissioned 9th November 2017
Civil Sub-Contracting & Cable Laying Works